Project

Visscher Grondvezet

When the grid connection is not sufficient, but power demand for electric heavy equipment is high, smart solutions are necessary. For this project, we implemented a 160 kW Voltra All-in-One charger that can perform independently of grid limitations.

Independence through solar and storage

Grid congestion need not stand in the way of the transition to electric equipment. By creating an integrated energy system with partners, the 160 kW fast charger is supported by a local network:

  • Solar energy as a source: The solar panels present generate the energy needed during the day.

  • Battery storage as a buffer: An advanced battery system stores the generated energy. As a result, the battery acts as an 'intermediate station' that can deliver the high power of 160 kW directly to the charger, even if the grid cannot handle it.

  • Always deployable: Thanks to this setup, heavy equipment is not dependent on the vagaries of the energy grid. The vehicles are charged at lightning speed and are always ready for the next job.

Compact power: The All-in-One advantages

The choice of the Voltra All-in-One 160 kW is ideal for locations where efficiency is paramount:

  1. High charging speed: specially designed for heavy equipment with large battery packs that need to be fully charged in a short time.

  2. Integrated design: all technology is integrated into the charger itself, eliminating the need for additional distribution boxes or separate power units on site.

  3. Smart control: The charger communicates with the battery system via an EMS to keep the energy balance on site optimal.

Sustainable certainty

With this configuration, the customer shows that making heavy equipment sustainable is possible. It is a future-proof investment that ensures operational continuity regardless of local grid capacity.